Thursday, October 9, 2014

Track layed

Hi all.

I have been busy laying track and making the wiring. While the 2nd isn't a pretty sight, the 1st one is more appealing.

So, I am using MicroEngineering code 70 track, and the plan I decided to stick with a version of Palmetto Spur from Lance Mindheim. While Lance makes the fiddle yard not part of the layout (on right), I will make it a part of the layout, just add scenery. I don't know if I will make a bridge, or some warehouses not rail served.

So, back to the track laying. I added some playwood between the two modules, so that I could add some copper clad sleepers so that the track at the end of each module could be more secure.

Let's look at some pictures.



Olá a todos.

Andei a assentar via e a fazer as ligações eléctricas. Enquanto a 2ª fase não é bonita, a 1ª é mais apelativa.

Estou a usar carril da MicroEngineering código 70, e  decidi usar uma versão do Palmetto Spur do Lance Mindheim. Enquanto o Lance usa uma gare fantasma desmontável, eu decidi que a mesma iria ser parte do layout, para adicionar cenário. Ainda não decidi se será uma ponte, ou uns quantos armazéns que não serão servidos por vagões.

Então, decidi acrescentar uns pedaços de contraplacado entre os módulos, de forma a que pudesse colocar solipas em circuito impresso, de forma a que a união entre os carris dos módulos fosse mais robusta.

Vamos ver algumas fotos.

The track was glued using liquid nails. / A via foi colada usado "prego liquido"

Here is the track and the copper sleepers. Notice that between the two modules is a strip of styrene. This has the width of my cutting disk, to prevent a big gap when the modules are connected together. The is idea is explained in detail by M.C. Fujiwara / A via e as solipas de cobre. Notem que está u pedaço de estireno entre os módulos. Tem a espessura do disco de corte. Isto será para previnir uma falha entre carris depois do corte feito. A ideia é explicada ao detalhe pelo M.C. Fujiwara.

The track soldered to the sleepers / A via soldada às solipas

The sleepers had to be trimmed and a gap was done at the center / As solipas foram cortadas e foi feito um golpe no centro.

The styrene was removed, and now you can see the result. / O estireno foi removido, e agora poderão ver o resultado.

Track is layed and the wiring is done. Now, let's run some TRAINS!!!! / A via foi assente, e o circuito eléctrico feito. Agora, vamos movimentar COMBOIOS!!!!

Best wishes.

No comments: